News | October 16, 2006

Triumph Group Selected To Provide Boeing 787 Floor Panel System

Wayne, PA - Triumph Group, Inc. announced recently that its subsidiary, Triumph Composite Systems, Inc., located in Spokane, WA, has been awarded a contract by The Boeing Company to provide the composite floor panel system for the Boeing 787 Dreamliner program. This initial award has an estimated value of $49M.

In addition to the 787 Floor Panel System, Triumph has recently been selected by Saab Aero structures to provide the 787 large cargo door actuation system and by Vought Aircraft Industries to supply integrated kits which include composite ducting, machined metal parts and fittings, hydraulic tubing, insulation and other components. Triumph has also been awarded contracts by Spirit Aerosystems for nacelle side skins and mounts, window assemblies and ducting and by Messier Bugati for brake assemblies.

SOURCES: Triumph Group, Inc.